Cloud that is engineered, not just migrated onto.

Solutions · Cloud & Infrastructure

Landing zones, automated provisioning and cost control built before the workloads arrive — so cloud becomes an operating capability rather than a hosting bill that grows quietly.

Why cloud disappoints after migration

Lifting servers into a cloud account without changing how they are provisioned, secured or paid for produces the same estate with a variable bill. The benefits — elasticity, automated recovery, rapid provisioning — come from engineering, not from the change of address.

  • The cloud bill grows and nobody can attribute the growth to anything specific.
  • Provisioning still takes days because it is still a manual request.
  • Environments differ from each other in ways nobody can enumerate.
  • Security configuration is applied by hand, and drifts.

What we build

A landing zone with identity, network, security and cost controls established first, and everything above it provisioned from code so environments are reproducible.

  • A landing zone: account structure, identity, network and baseline security
  • Infrastructure as code, so environments are reproducible rather than described
  • Guardrails that prevent misconfiguration rather than reporting it afterwards
  • Cost allocation by workload and team, with budget alerting
  • Automated backup and recovery aligned to stated objectives
  • A migration plan sequenced by dependency and risk

How it runs

Foundations before workloads. Retrofitting a landing zone under a populated estate is considerably harder.

  1. 01
    Design the landing zone

    Accounts, identity, network segmentation and baseline controls, sized to your governance rather than to a reference diagram.

  2. 02
    Codify everything

    Infrastructure defined as code from the outset, so environments can be recreated rather than remembered.

  3. 03
    Set the guardrails

    Policy that prevents public exposure and unencrypted storage at creation, rather than flagging them in a monthly report.

  4. 04
    Migrate by dependency

    Workloads moved in dependency order, with the awkward legacy dependency identified before the move rather than during it.

  5. 05
    Control cost from day one

    Tagging, allocation and budget alerts in place before the estate grows, because retrofitting attribution is painful.

What changes once it is running

What engineered cloud produces that lift-and-shift does not.

Provisioning becomes minutes

Environments are created from code rather than requested and built by hand.

The bill becomes explicable

Cost attributes to workloads and teams, so growth is a decision rather than a mystery.

Environments match

Reproducible definitions remove the class of failure that only appears in production.

Misconfiguration is prevented

Guardrails stop the exposure at creation instead of finding it in an audit.

How an engagement is shaped

Landing zone first, whether you are migrating or already there.

01

Assessment and design

Two to four weeks on current estate, dependencies and governance, returning a landing zone design and a sequenced migration plan.

02

Foundations and migration

Landing zone built, then workloads migrated in dependency order with rollback available at each step.

03

Operate and optimise

Optional managed operation, including cost optimisation once real usage patterns are visible.

Common questions

The things buyers ask before they commit. If yours is not here, it is a good first question for the assessment.

Which cloud provider should we use?
Whichever fits your workloads, your existing licensing and your regulatory constraints. We work across the major providers and are not incentivised toward any of them.
Will cloud be cheaper?
Not automatically, and often not at all for steady-state workloads that were already running on owned hardware. It buys elasticity, speed of provisioning and recovery capability. If cost reduction is the only objective, we will say so early.
Can we run hybrid?
Yes, and many organisations should. Latency, data residency and existing investment all make hybrid a sound answer rather than a compromise.

Can you attribute last month’s cloud bill?

If not, the tagging and landing zone work usually pays for itself before the migration does.